Its no fun to just sit and wait and see what happens , far more fun to speculate and create drama ( cuz the wait is so boring)... and there are still soo many unanswered questions ;-)
Why fight over any of it?If I were being pedantic JoePah, I would point out that shipping was quoted as being May 1, not May 30, but its close enough, why fight over a month?
I've seen no proof, nor any claim by Storm that 5000 bikes have been shipped. so far, I've seen one container, I'd really like to see more of the production line than I have.
Amazing feat? The bike is all production parts save for the lunch box.. I don't see it as anything other than run of the mill.
Pedal assist increasing range by 50 percent.. seriously? .
There is no right to access to a Communist state owned and controlled industry. China is where everyone knowingly invested money. You get what they give and you're lucky to get that.
That wasn't the question and answer. The original post requested more photo proof! With China you get what they give, nothing more.I know it sounds strange here in the United States, where politics and money are one and the same almost.
China is a totalitarian, repressive government socially ...but much closer to capitalistic than, say, the old Soviet Union was ...when it comes to good old money.
Sondors, and his supporters, will get from Chinese factories what the Sondors campaign purchases from them.
So at 1.8 amps per hour it will take 4-5 hrs to fully charge a depleted battery?? And if production of the Black/Yellow bikes
will be completed at the end of next week... That's approx. 2000 bikes in 20 days or a 100 bikes a day... so only 60 days more until 8000 bikes are built... something like that.... right... assuming they build in sequence... ending with the Blue/Black bikes.... What happened to the 12-14,000 bikes a month??
So at 1.8 amps per hour it will take 4-5 hrs to fully charge a depleted battery?? And if production of the Black/Yellow bikes
will be completed at the end of next week... That's approx. 2000 bikes in 20 days or a 100 bikes a day... so only 60 days more until 8000 bikes are built... something like that.... right... assuming they build in sequence... ending with the Blue/Black bikes.... What happened to the 12-14,000 bikes a month??
@ pxpaulx, agree that a proper charger and ditching the patently false claim of a 90 minute charge time is sensible, but that is hardly a defence concerning the deception inherent in this Campaign.
I agree, but it isn't the first or last time a campaign makes a change to their product. If there weren't so many other things surrounding the campaign negatively, it would have been greeted with a shrug, and I'm sure that is what a majority of the contributors will do. It will go like this:
Those who are against the campaign will put a feather in their cap and wag their fingers some more about the campaign being untruthful.
Those who contributed will say I paid for a $500 crowd funding campaign on a bike I consider a good value and accept the change made, so what? (...not everyone, but most will be in this camp)
And we'll all begin again tomorrow
The question is would the
The question is would the campaign have been so successful if what was known about the ebike was promoted and advertised?
1) Charge time of 4-5 hours
2) 10-20 mile range
3) weight 60lbs
4) 6-8 month delivery time (from Feb 2015, never was manufacturing all in place as claimed)
and with that I must stop for the day and go cold turkey, great weekend everyone - luvvin' the BMW cruise ebike, I have not seen anyone else use an ebike in the UK!!!