I ordered an HT1000 back in September, which is the "skinny" tire version of the Hunter. Right at 120 days I got a text that said that they were out of stock on the Shimano m8000 drivetrain that I'd spec'd and that they might not get resupply until after Chinese New Year. They offered SRAM NX, but I'd only read bad things about shifting performance. I figured why did I spec top of the line components on everything else and then switch out the drivetrain to bottom of the line SRAM, so I accepted the delay. If they don't ship until mid to late Feb, then it'll be a 5-6 month turn time from date of order. In hindsight, I could've accepted the SRAM, then craigslisted it when I got it in my hands, but I'm taking the zen path with the wait. It'll show up when it shows ups. So far, no indication of hidden fees, though. Smooth transaction when I ordered. Still only have 50% down and am not expected to pony up until the bike is completed. The M2S looks like a nice bike.