Hey @Jay Kay did your SD mountain rohloff arrive last week? I've been waiting for mine, though I think through a different bike shop than yours (Brisbane, that's the closest one for me, despite being 400km away). It was initially due early Jan, then late Jan and still no news from itI have a 2021 Superdelite Mountain Rohloff arriving (Australia) this week, ordered at the start of September 2020. This bike is replacing my 2020 Delite GX Fox ordered at the same time of the year (start of September 2019), which arrived mid January 2020. So 1-2 weeks difference in delivery time for the 2 bikes, one pre-COVID, the other with COVID full swing.
There was no change to the 2021 SD Mountain, so I think @JVBulman is on the money.
I received mine this weekend!! Strangely mine came in with Hans Dampf tyres ...Yeah, I have bent a pedal on a rock already lol. It is way more playful off road than I expected, compared to my Delite GX with Fox. Subtle geometry changes and the Nobby Nic 27.5 tyres is all it took. Lets hope yours arrives in the next week or two!
Why are you worried, Matt? Schwalbe specs list Hans Dampf as tyres superior to Nobby Nic...It's strange because the marketing photography on R&M site has the bike with the HD tyres but states Nobby Nic on the specs ...
I ordered a Multicharger Vario on November 3rd, 2020 through a local bike shop; I gave them $1,000. deposit. Shop guy told me that R&M would not be building the Multicharger line until some time in February 2021. Around February 23rd I was alerted that my bike was built and would likely arrive in Toronto late March or early April. To my pleasure, the bike arrived in March and I picked it up on March 19th.How many months/weeks are people experiencing for a Riese Muller bike delivery at this time. Thanks