pushkar
Well-Known Member
Yes, definitely resolvable. Firmware upgrade will enable it.
However we have not had good luck with bringing 60V down to 12V without significant issues. Infact the current Bafang step down also contributes to that issue partially in the stock(bafang) controller.
In the interim, we will ship the KTV smart light with orders for motors.
That being said, the real way to resolve this is to do it right. I am working on a unified light + controller harness that will solve multiple problems - have higher power output for front light, brake function for rear lights, standard IP67 rated connectors, have a power output for phone charging, extra outputs if needed.
Pretty cool design - and hope to have something over the coming months. No need to fiddle with brakes, random connectors etc etc - just get the single cable and we are good.
However we have not had good luck with bringing 60V down to 12V without significant issues. Infact the current Bafang step down also contributes to that issue partially in the stock(bafang) controller.
In the interim, we will ship the KTV smart light with orders for motors.
That being said, the real way to resolve this is to do it right. I am working on a unified light + controller harness that will solve multiple problems - have higher power output for front light, brake function for rear lights, standard IP67 rated connectors, have a power output for phone charging, extra outputs if needed.
Pretty cool design - and hope to have something over the coming months. No need to fiddle with brakes, random connectors etc etc - just get the single cable and we are good.