I figured I'd post about my production estimates and delivery schedule, since I wished more people were doing that while I waited for my bike to arrive.
I ordered a Superdelite HS Rollof, GX, Fox air suspension, Nyon, and air shipping on January 15th.
The initial production estimate was March 29 - April 4th. Once I got my build info the next week, R&M's website was showing March 29 - April 2nd. It has stayed on that estimate up through March 16th. Now on the morning of the 17th it is showing March 15th through March 19th, so it moved up over two weeks. I can only assume that number is accurate, since why would you move it up to the current week, if you didn't also start production.
For context I am on the east coast of the USA.
I'll update this as things change.
I ordered a Superdelite HS Rollof, GX, Fox air suspension, Nyon, and air shipping on January 15th.
The initial production estimate was March 29 - April 4th. Once I got my build info the next week, R&M's website was showing March 29 - April 2nd. It has stayed on that estimate up through March 16th. Now on the morning of the 17th it is showing March 15th through March 19th, so it moved up over two weeks. I can only assume that number is accurate, since why would you move it up to the current week, if you didn't also start production.
For context I am on the east coast of the USA.
I'll update this as things change.