Search results

  1. pushkar

    Watt Wagons Critical Product Availability Status

    Nothing as of 4:45 pm yet.
  2. pushkar

    Battery Charger at Purchase

    1. 4A / 5A is respectable. I believe the batch of new chargers we got are actually 4A, and not 5A. 2. Satiator 7A - great programmable charger - if you have batteries with different voltages. 3. WW 10A is great, however its usage is slightly different. It is designed fro 52V (14S) batteries...
  3. pushkar

    Watt Wagons Critical Product Availability Status

    late June / early July is reasonable.
  4. pushkar

    Watt Wagons Critical Product Availability Status

    Yes. Definitely super hard to get. We have 4 front suspensions (E-38). No rear shocks unfortunately.
  5. pushkar

    Watt Wagons Critical Product Availability Status

    We heard that the constraints should get easier by December, January. However that is what everybody was saying about this summer, and it’s nowhere close. The top firms like Magura / shimano are already tracking 2023, 2024 for some deliveries. Though it will get recalibrated to late 2022 if...
  6. pushkar

    Watt Wagons Critical Product Availability Status

    Paint and build is prioritized for founders - we can do those 1-2 weeks (total) for both activities. We also just brought on a fairly senior shop manager to help us expedite the builds. He went over the helios build list, methods and I believe we can do it even faster once the frames are...
  7. pushkar

    Watt Wagons Critical Product Availability Status

    Founders have parts reserved. except for 2 items 1. Kindernay - they ship every 2-3 weeks , and we have enough to cover most founders. 2. Supernova - finally came in last week. We are short by 6 but Another smaller shipment is on its way.
  8. pushkar

    Watt Wagons Critical Product Availability Status

    We have 3 DVO Topaz air.
  9. pushkar

    Watt Wagons Critical Product Availability Status

    Light chip is self install. Essentially it is a small DC-Dc step down converter + some code. Will need XT 30 connectors - we will ship it with the connectors, splitters etc.
  10. pushkar

    Hydra Build Pics???

    All, we have created a component availability dashboard here. I have also posted this on a sticky post on EBR here. This will be updated weekly.
  11. pushkar

    Watt Wagons Critical Product Availability Status

    We are taking a step towards providing additional transparency on our component, bike, accessories availability and shipping times. We are trying not to get too granular but provide a more macro visibility on delays / shipping and any delays with your order. We plan to update it every week...
  12. pushkar

    Hydra Build Pics???

    I have tested this on commuters / paved roads. The trick is to actually use a smaller inner tube with Tannus. If you use a full-size tube, that leads to an unintentional balance issue on the tire (some portions of the tire get flattened out, but others remain thicker with extra material)...
  13. pushkar

    Hydra Build Pics???

    If you want we can leave the cable Un- trimmed. Yup. I’ll take a pic in the daylight tomorrow. I think all colors are coming out really nice tbh. Also we have experimented with decals - trying to see if white or black looks better on a color. If you want to switch decal colors , just let us...
  14. pushkar

    Hydra Build Pics???

    Yes.
  15. pushkar

    Hydra Build Pics???

    I’llhave more pics this weekend. All 27.5 rears are still being painted so will post pics with matte black rears.
  16. pushkar

    Hydra Build Pics???

    Almost Finished 4 today. Will wrap up another 4 this weekend. The midnight bronze bikes are on deck Just waiting for controllers to come in so we can swap and ship these out. the frame from Krazy customs IG will also be on tomorrow. It’s getting decals. we also got tannus Armour. You can ask...
  17. pushkar

    The "UNOFFICIAL" Atom FAQ thread...

    Yes, in July.
  18. pushkar

    Hydra Build Pics???

    I agree - would look great. Nope. stock rims.
  19. pushkar

    Hydra Build Pics???

    Yup. The goal is to post build pics + shipping pics.. :)
  20. pushkar

    Hydra Build Pics???

    From scratch - 7-8 hours. For carbon, it is around 10 hours - dummy wheel for building, and final rim once we know we aren't going to scratch it. :) We have 3-4 stations - so can parallel them. We still ramping up, so throughput is lower - but getting there.
Back